Sangrama-Sopore-Kulangam Road
|
|
Dated: 05 October 2009
|
|
Sangrama Sopore Road
|
|
|
|
27.3 Km road completed and handed over to R&B Deptt
|
|
|
|
Dated: 01 October 2009
|
|
Thajiwara Shangus Road
|
|
|
|
Thajiwara Shangus Road
|
|
|
|
Dated: 30 September 2009
|
|
wanpoh Chawalgam Aharbal Road
|
|
|
|
42.7 Km Road Completed and handed over to R&B Deptt
|
|
|
|
Dated: 02 September 2009
|
|
Bridge Complete
|
|
|
|
Completed view of the BRidge. only approaches have to be constructed.
|
|
|
|
Dated: 02 September 2009
|
|
Bridge Trafficable
|
|
|
|
Completed view of the Bridge. Traffic Plying on the bridge from Aug-2009
|
|
|
|
Dated: 02 September 2009
|
|
Retaning Walls
|
|
|
|
Constrcution of Retaining walls along the roadsite, as per design.
|
|
|
|
Dated: 02 September 2009
|
|
Retaining wall and Drain
|
|
|
|
Drain and Retaining walls, work in Progress.
|
|
|
|
Dated: 02 September 2009
|
|
Bridge Traffic Ready
|
|
|
|
On 2-Sep-2009, Bridge Inspected by Admin-Off and Net Admin. Traffic is Playing on bridge and Painting is in final stage.
|
|
|
|
Dated: 02 September 2009
|
|
Road Start Poing
|
|
|
|
Completed view of the road starting point
|
|
|
|
Dated: 02 September 2009
|
|
Drain Along the Roadsite
|
|
|
|
Drain constructed along roadsite at Chaadora Market.
|
|
|
|