Rangil Water Supply
|
|
Dated: 15 March 2010
|
|
Inauguration of Rangil Water Supply Scheme
|
|
|
|
Inaugurtion held at palpora near palpora pipe rack
|
|
|
|
Dated: 15 March 2010
|
|
Inauguration of Rangil Water Supply Scheme
|
|
|
|
HCM addressing a large gathering.
|
|
|
|
Dated: 15 March 2010
|
|
Inauguration of Rangil water supply scheme
|
|
|
|
HCM is satisfied with the quality of water
|
|
|
|
Dated: 15 March 2010
|
|
Inauguration of Rangil water supply scheme
|
|
|
|
HCM dedicating Rangil Water Supply to the State.
|
|
|
|
Dated: 15 March 2010
|
|
Inauguration of Rangil water supply scheme
|
|
|
|
Palpora pipe rack for pipe crossing over river Jhelum Water Supply Scheme Rangil
|
|
|
|
Dated: 25 February 2010
|
|
Boundary Wall under contruction
|
|
|
|
The visual showing the boundary wall with contreate and brick masonry under process
|
|
|
|
Dated: 22 February 2010
|
|
Work Starts on Plantation
|
|
|
|
|
|
|
|
Dated: 22 February 2010
|
|
Main Site where Landfill Cells will be constructed
|
|
|
|
Site clearance for Landfill Cells in in under progress
|
|
|
|
Dated: 08 January 2010
|
|
Typical Design
|
|
|
|
Work in Progress.Contract Monitored, Design parameters as visible
|
|
|
|
Dated: 08 January 2010
|
|
Macadamized road
|
|
|
|
Macadamized road and Reinforcement of Bridge.
|
|
|